Progress Tracking Against Baseline.
Measure physical progress against the plan in real time, so a slipping package shows up while you can still recover it.
- "Hundreds of work orders, dozens of contractors, one clear view. ProcureX keeps our landmark project moving on schedule without the daily firefighting."
Narsi Reddy
Director, Trump Tower

- 0 wks
Earlier Slippage Detection
- 0%
Fewer Delayed Decisions
- 0 wks
What Makes Procurex Work
See Real Progress, Not Guesswork.
Capture physical % complete against the baseline on every package.
Spot Slippage Early.
Actual-vs-plan variance surfaces before it reaches the critical path.
Tie Progress To The 4Ms.
Link progress to the men, machinery, and material availability on site.
Everything This Covers
Built to move the outcome, not just the data.
Capture Physical Progress, Not Opinions.
Site-reported % complete against the baseline on every package and activity — what's actually built, not what's hoped.

Catch Slippage Before The Critical Path.
Plan-vs-actual variance flags delay early, while there's still float to recover it.

Tie Progress To The 4Ms.
Connect each update to the manpower, machinery and material actually deployed on site that week.

One AI layer, Present Of This Page.
The copilot drafts the look-ahead from the baseline and flags tasks that are slipping out of sequence.
Construction Planning That Just Holds.
ProcureX is where the baseline stops being a chart nobody runs - and becomes the plan your whole site works from, end to end.
One connected plan
Baseline and weekly look-aheads are a single plan - not separate files.
Run against the baseline
Re-plan freely - the baseline is kept for variance and defensible EOT claims.
AI handles the busywork
IntelliSuite drafts the look-ahead and flags tasks slipping out of sequence.
Fits your stack
Imports Primavera P6, MS Project and Excel - no rip-and-replace.
Built for Global sites
RA billing, the 4Ms and ₹ lakh / crore reporting, out of the box.
One source, every role
Directors, planners, finance and execs all work from one programme.
Physical % complete is captured against the baseline on every package — from the field, tied to the work actually done, not a number estimated on a review call.
Actual-vs-plan variance surfaces as soon as it appears — so a slipping package is flagged before it reaches the critical path, while you can still recover it.
Yes — progress is tied to the men, machinery and material actually on site, so you can see not just what's behind but why it's behind.
Yes — what's physically built flows into RA / progress billing and your finance system, so the bill and the site finally agree on one number.